>> Aluminum Conductor Manufacturing Plant – Dammam 2nd Industrial City, K.S.A. (MIDAL)

Midal Bahrain has awarded their new project to set up up an Aluminium & Aluminium Alloy wire & conductor factory – Midal Cables Saudi Arabia LLC located at Modon Industrial park, Dammam, Saudi Arabia with the capacity of over 15,000 MT. to Sariya Contracting.

The construction for the plant has commenced at site. The facility is expected to be operational early May 2014.

This facility is being set up using the latest equipment and technology available in this business.

Midal Saudi Arabia caters to the local and regional markets meeting their specific requirements.

Project component : An industrial facility composed of a Production area of 7300 sqm, administration area of 800sqm, Guard rooms, Sceco and miscellaneous site facilis.






>> Jabal Omar Development Project Zones (S3&S4)

INTRODUCTION AND OVERALL PROJECT DESCRIPTION

PART 1: GENERAL


1.1 PROJECT PRIEF

A. The Jabal Omar Development Project is a unique urban re-generation scheme purposing to provide hotel accommodations, commercial/retail spaces, car parking, public spaces and public amenities to support religious, social and commercial activities to Hajj and Umrah pilgrims all year round.

􀁸 Land area is approximately 230.000 sq.m.
􀁸 Built up floor area is approximately 2 million sq.m.
B. The Client: JABAL OMAR DEVELOPMENT COMPANY (JODC)
C. The Project Manager: HILL INTERNATIOANAL (PM)

1.2 BUILDING DESIGN & CONSTRUCTION WORKS:

A. Buildings within zone S2/S4 which is part of the South Zone under comprise a Podium and 4 Hotel Towers.
B. The Podium contains commercial/retail spaces, car park, hotel lobbies and technical areas.
C. The 4 hotel towers are 5 star hotels operated by international hotel operators.
D. SBG (Saudi Binladin Group) has progressed with part of the design works including architectural, structural and MEP
E. SBG had progressed and completed part of the rock excavation and foundation works comprising piles

1.3 PROJECT LOCATION:

A. The Site is located within MAKKAH & THE HOLY ENVIRONS Zone as a part of the South Zone of Jabal Omar Development Project with viewing corridor to the Al Masjed Al Haram.

1.4 SITE AREA:

The project has a total Built-UP Area of 208.316 sq.m The Plot Area is 11.351.60 sq.m.

1.5 SITE DESCRIPTION:

A. The site is an undeveloped area and currently is being surrounded by multiple uses, including Residential and public facilities.

1.6 BUILDINGS HEIGHT

􀁸 Number of stories of the Podium is 12 floors up to 49.40m high. 􀁸 Number of stories of the for tower is 24 to 26 floors (including technical floors) up to 112.80m high.


1.7 PROJECT CONTENTS

􀁸 Technical floors
􀁸 Tower (hotel rooms ) floors
􀁸 Villas floors
􀁸 Hotel lobby floor
􀁸 Basement (car park) floors
􀁸 Commercial / retail floors


1.8 ZONE S3/S4

1.8.1 Zone S3/S4 plot and building details






END OF SECTION